news

Nigeria’s power grid operator deploys emergency transmission towers in Port Harcourt

PORT HARCOURT — The Transmission Company of Nigeria (TCN) has received 15 Emergency Restoration Towers (ERTs) at its Port Harcourt regional office in southern Nigeria to strengthen its rapid-response capacity against power line collapses.

Transported from TCN’s central storage facility in Ojo, Lagos, the consignment arrived on Saturday, 14 November 2026, and includes modular tower structures, bases, and guywire and skywire tensioning accessories.

Designed as rapid-deployment temporary structures, ERTs let engineers quickly bypass damaged or vandalized high-voltage pylons and restore electricity transmission while permanent reconstruction continues.

TCN said the equipment boost will reduce grid downtime and improve transmission reliability across the Port Harcourt operational zone—a critical corridor supplying electricity across Nigeria’s oil-producing Niger Delta region.

Tags

About the author

Africa

Add Comment

Click here to post a comment