news

Nigeria’s capital faces 10-hour power cut for grid upgrades

Parts of Nigeria’s capital, Abuja, will experience a 10-hour power blackout on Saturday as engineers carry out upgrade work on the national electricity grid.

The state-run Transmission Company of Nigeria (TCN) said maintenance crews will work at the Katampe transmission substation from 08:00 to 18:00 local time (07:00 to 17:00 GMT). Engineers will be connecting newly installed high-voltage switching equipment at the facility, which steps down electricity for local distribution.

Because of the work, the local utility provider—the Abuja Electricity Distribution Company (AEDC)—will be unable to supply power to several residential and commercial districts across the city and its surrounding suburbs.

The affected areas include:Kubwa and Bwari, parts of Gwarimpa and Dawaki, Deidei, Zuba, Dakwa, Sabon Wuse, and the Kaduna Road corridor

TCN has apologised to residents and businesses for the disruption.

Tags

About the author

Africa

Add Comment

Click here to post a comment